Plenary 9am - 12 pm
Agenda-Handout 1
Draft Feb 5 2007 PCWA Plenary Meeting Notes.doc-Handout 2
Draft Plenary Action Item- 5-7-07- Handout No 3.xls
Final Technical Study Plans Handout 4 - Link to non-internet public figures: FTP Server or Request FTP Login
AQ1 Instream Flow
Final AQ1-Instream Flow_Rev 5_5-7-07.doc
Non-internet pulic figures
AQ2 Fish Population
Final AQ2-Fish Population_Rev 5_5-7-07.doc
Non-internet pulic figures
AQ4 Water Temperature Modeling
Final_AQ 4-Water Temperature Modeling_4-25-07.doc
Non-internet pulic figures
AQ11 Water Quality
Final_AQ 11-Water Quality_4-25-07.doc
Non-internet pulic figures
AQ12 Special-Status Amphibian & Aquatic Reptiles
Final AQ12-Amphibians_Final_5-7-07.doc
Rec5 Visual Quality Assessment
Final_REC 5-Visual Quality_4-25-07.doc
Final_Table REC 5-1_4-25-07.doc
Final_Table REC 5-2_4-25-07.doc
Additional Meeting Materials
Draft AQ-TSP implementation schedule_5-07-07.xls
Draft REC-LAND-TSP implementation schedule_5-07-07.xls
Draft TERR TSP-CUL implementation schedule_05-07-07.xls
PAD Outline_05-07-07.doc
Proposed TSPs 5-7-07.doc
Sign-in Sheet
Technical Working Groups
Terrestrial 1 pm - 4 pm
Agenda
TERR1-Vegetation Communities-TSP_Rev3_4-30-07_with track changes.doc
TERR2-Special-status Plant Study-TSP_Rev3_4-30-07_with track changes.doc
TERR3-Noxious Weeds Study-TSP_Rev3_4-30-07_with track changes.doc
TERR4-Special-status Wildlife Study-TSP_Rev3_4-30-07_with track changes.doc
TERR5-Bald Eagle Study-TSP_Rev2_2-16-07.doc
TERR6-Special-status Bat Study-TSP_Rev3_4-30-07with track changes.doc
Sign-in Sheet